The Hardest Part of CMAR Isn’t Technical — It’s Psychological
By: Chad Abell, Principal Architect / ALEP / Sector Lead
Every architect who’s spent real time in Construction Manager at Risk (CMAR) delivery eventually has the same realization: the hard part isn’t learning a new process. It’s unlearning an old instinct.
In traditional design-bid-build, the architect typically develops the design before the contractor is selected. The contractor comes on board afterward, and the structure of the process can create an adversarial dynamic: bids get contested, questions can become disputes, and when something goes wrong, the lines are clean. Disputes tend to circle the question of “Should this have been picked up in the bid?” with each side pointing back at the documents to make its case.
CMAR flips that. The construction manager is at the table early, often before the design is even fully formed, pricing decisions as they’re being made. That means design feedback shows up during pricing, not after it. For architects accustomed to the traditional process, that can take some adjustment. Having someone weigh in on a decision before it’s finished can feel like your authority is being second-guessed before you’ve had the chance to finish the thought.
But that discomfort is exactly the thing to get past, because what CMAR actually asks for isn’t less design authority. It’s a different approach to design leadership — one built on collaboration rather than control, and a willingness to set ego aside and work things out jointly with someone who, in the traditional model, wouldn’t have been involved until much later.
The Contract Alone Doesn’t Create Collaboration
What makes this more challenging is that the architect and construction manager typically have no direct contractual relationship with each other. The owner holds both contracts separately. Legally, there is likely nothing binding the two teams to work well together.
That means the collaboration that makes CMAR work isn’t simply a feature of the delivery method. It’s a choice both sides have to make, repeatedly, without a contract forcing the issue. When it doesn’t happen, the result can be predictable: budgets get tight, design gets value-engineered reactively instead of thoughtfully, and the relationship can slide into conflict and blame because there was never a real partnership to lean on in the first place.
That also means CMAR isn’t automatically better than design-bid-build. It’s only as good as the relationship the people involved choose to build. Not every architect or construction manager adapts easily to this model. Architects must be willing to welcome construction expertise while maintaining responsibility for the design. Construction managers must embrace a role that goes beyond pricing and building the project. Their job is broader than a traditional GC’s: managing cost, schedule, and constructability on one hand, and helping protect design intent on the other. That’s a bigger job, and a bigger responsibility.
The projects that go well are the ones where both sides recognize that despite the lack of a contract between them, their separate responsibilities are best fulfilled through a shared commitment to the owner’s goals.
CMAR Collaboration in Action: The McNeese State University Student Union
AQ Studios saw all of this play out on the student union project at McNeese State University, delivered as CMAR with Lemoine as the construction manager at risk.
The relationship among our design team, Lemoine, and the university was strong from the start — three parties working closely and collaboratively toward a design that was genuinely dynamic and meaningful for the students it was built for. That collaboration is what made the project good. But it’s also what got it built, because the project ran straight into a real test.
We began talking about this project before Hurricanes Laura and Delta. We executed it after they struck. In between, construction pricing in Louisiana became extraordinarily volatile. Scope had to be reduced and reworked more than once to keep the project inside budget, and the university understandably didn’t want to give up any of the programs it had promised its students.
That’s the moment where the collaborative model mattered most. It wasn’t a contractual provision that brought Lemoine and our team together to solve that problem — it was a relationship built on trust from the start of the project. Without it, that kind of pressure can quickly lead to competing priorities and difficult disagreements. Instead, it turned into problem-solving — three parties working through a genuinely hard constraint together, rather than defending positions against each other.

Why Collaboration is Essential to CMAR Success
CMAR doesn’t guarantee a good outcome just by putting the right names on the org chart. It asks both sides to choose a collaborative posture over a defensive one with nothing in the contract requiring it. That choice is harder than it sounds for anyone accustomed to the traditional design-bid-build delivery model.
Leaning into CMAR collaboration, deliberately and consistently, is where we believe AQ Studios does its best work. It’s a mindset we’ve built real comfort with, project after project. For owners, that collaboration means difficult decisions can be addressed earlier, with a clearer understanding of their impact on cost, schedule, design quality, and long-term value. And when the collaboration is genuine, the outcome is a better building — one that reflects the owner’s priorities and survives whatever the world throws at it between the first sketch and the ribbon-cutting.
Chad Abell, AIA, ALEP, is a Principal at AQ Studios with 34 years of architectural experience and extensive experience delivering CMAR projects throughout Louisiana. He served on the Louisiana Public Bid Legislative Task Force, helping advance legislation expanding the use of CMAR on public projects. Chad is a featured panelist discussing CMAR at The Blueprint Conference 2026 in New Orleans.